Data Centre Backup Generators

500kVA to 2,500kVA · Cummins · Perkins · Doosan · MTU

Keep your data centre online when the grid fails. Full installation, ATS integration, synchronising, and commissioning across Malaysia.

1,000+ Generators Deployed · 24/7 Emergency Support · 12+ Years in Business

Every Second of Downtime Costs Thousands

Malaysian data centres face growing power reliability challenges.

Grid power outage icon

Grid Instability

TNB outages happen without warning. UPS systems bridge the gap for minutes — but without backup generation, your data centre goes dark.

Server rack overheating icon

High-Density Loads

AI clusters and cloud infrastructure push power demands beyond what aging grid infrastructure was designed to handle.

Financial loss icon

SLA Penalties

Every minute of downtime can cost tens of thousands. SLA breach penalties, lost revenue, and hardware damage compound fast.

Data centre server room with backup generator

Complete Generator Systems

Engineered for mission-critical data centre standby applications.

CAPACITY
500kVA – 2,500kVA
ENGINE BRANDS
Cummins, Perkins, Doosan, MTU
CONFIGURATION
N+1 or 2N Redundancy
ATS INTEGRATION
Automatic Transfer Switch included
SYNCHRONISING
Parallel operation ready
COMPLIANCE
Mission Critical rated, 100% load factor

Built for Mission-Critical Reliability

Fuel Polishing System

Automated water separation and particulate filtration keeps diesel degradation-free during long standby periods. Critical for facilities where generators sit idle for months.

Sound-Attenuated Canopy

75dB at 7 metres. Essential for urban data centre locations in Cyberjaya and KL where noise regulations apply.

Sub-Base Fuel Tanks

8 to 24 hour continuous run capability. Extended base tanks keep your facility powered through prolonged grid outages.

Weekly Exercise Timer

Auto-starts weekly to verify system readiness. Logs performance data for compliance audits and maintenance scheduling.

Synchronising Capability

Multiple gensets run in parallel for N+1 and 2N configurations. Seamless load sharing with Deep Sea control systems.

Remote Monitoring

Real-time GSM and IoT monitoring. Fuel level, coolant temperature, fault alerts and run hours pushed to your NOC.

Parallel synchronised data centre generators for N+1 redundancy

Trusted by Malaysian Enterprises

1,000+
GENERATORS DEPLOYED
12+
YEARS IN BUSINESS
99.9%
UPTIME TRACK RECORD

Suruhanjaya Tenaga Registered · SSM Registered · Authorised Dealer: Cummins, Perkins, Doosan

One Supplier, Start to Finish

From first site visit to annual maintenance — we handle everything.

1

Site Survey

Free assessment and load calculation at your facility

2

Sizing & Spec

Engineer recommends capacity and configuration

3

Supply

Genuine engines, factory-tested and quality-checked

4

Installation

Professional mechanical and electrical fit-out

5

Commissioning

ATS setup, synchronising, full load testing

6

After-Sales

24/7 emergency support and annual health checks

Data centre generator ATS control panel commissioning

Frequently Asked Questions

What kVA size do I need for my data centre?

It depends on your total IT load, cooling systems, and redundancy requirements. A 1MW facility typically needs 2x 500kVA generators in N+1 configuration. We provide free site assessments to determine exact sizing.

How long does delivery and installation take?

Stock units deliver in 1-2 weeks. Custom configurations take 4-8 weeks. Commissioning takes 3-5 days on-site. Emergency expedited delivery is available.

Do you provide ongoing maintenance?

Yes. Annual maintenance agreements include fuel polishing, load bank testing, filter changes, and priority emergency response with guaranteed SLAs.

Can you synchronise multiple generators?

All our data centre generators are synchronisation-ready with Deep Sea or ComAp control systems. We commission parallel configurations up to 2N redundancy.

What warranties are included?

12 months comprehensive warranty on the complete unit. Extended coverage up to 5 years available. Engine manufacturer warranty applies separately.

Do you serve all of Malaysia?

Yes. We’ve deployed generators to data centres in Cyberjaya, KL, Johor, Penang, and across Malaysia. Full installation and commissioning included nationwide.

Ready to Secure Your Data Centre Power?

Free site assessment. We reply within 24 hours.